Our Directors and Offshore Construction Managers have direct experience with some of the world's most complex offshore projects. Our team brings together incredible experiences to provide innovative turn-key offshore solutions.
Normand Installer Nigeria suction pile instillation (Agbami field) 12x 100-ton suction piles installed in Agbami Field Nigeria (1200m water depth)
Disaster management, oil prevention and salvage of detached SALM buoy. Water flushing of oil in SALM system, shortening of loading hose for tow to dry dock. Diving works on SALM base, closing of pipe-line valve, blanking off hard piping and air lifting of SALM base for inspection.
Installation and commissioning of SALM Buoy (Sakhalin Russia). SALM Repair Works (Japan) Supervising of repair works to SALM Buoy in Japan. Preparations of towing arrangement and instillation aids. SALM ballast system flushing and Function testing.
Disconnection of 12-inch Riser and 9 Anchor legs. Hook up towing vessels and tow to anchorage site. Disconnection and disassembly of Floating Hose Strings.
All preparations for FPSO FRADE installation, Turret Works, Towing arrangements, Installation Aids and air diving area prep works.
FDPSO AZURITE Hook up, 12x Anchor legs (Fixed spread Mooring)
Floating Hose string assembly, installation, and pressure testing.
Installation of 6x Driven Piles and anchor chains (184mm) and the recovery of old mooring spread.
FSO Hook-Up / Installation, 6x Mooring legs, 1x Riser, 1x Umbilical.
Installation and Hook-Up of FPSO CAPIXABA, 9x Anchor Legs (1500m Water Depth)
FPSO FRADE Floating Hose assembly and Installation (24” Double Line) Pressure Testing, commissioning of Floating Hose System.
ELECTRICAL CABLE LYING (TOTAL CONGO) NORMAND INSTALLER Laying of 4x Electrical cables Jacket to Jacket, and hook up into Platforms.
Electrical Cable laying (13,5Km) in Grondin Field Gabon. ROV Pre-lay surveys, as built surveys. Oceanic Installer (formerly, Dynamic Installer)
Iraq Crude Oil Expansion Project (Leighton Eclipse) Lay Barge 3x SPM Anchor systems installation (18x Driven Piles and 18x anchor chains) Monitoring of all offshore installation works with regards to 3x Full SPM Buoy Installations
Iraq Crude Oil Expansion Project (Leighton Mynx) Construction Barge Monitoring of all offshore SPM Installation works with regards to 3x Full SPM Buoy Installations Client liaison / advisor for all associated installation works
Pan Marina develops tailored offshore solutions that work specifically for Client operations. Our flexible and collaborative approach ensures stakeholder satisfaction and reliable work delivery.